Further information
Nexgen > Wind Masts > 20/30/40/50m WindMast
Innovative design
The superior design of the WindMast class guarantees ease of assembly on site. Minimal effort is required to erect, thanks to a straightforward tilt-up system.
Specifically designed with remote monitoring in mind, our WindMasts have survived simulated wind tests of up to 200mph.
Lightweight components mean the masts can be transported in sections, making them easy to carry and avoiding the need for heavy vehicles.
Fast installation times prove a great advantage in adverse conditions and with delivery right to your door anywhere in Europe we make your job as easy as possible.
Leaves only footprints
Once installed, our WindMast enables accurate wind monitoring at the required height with minimal visual impact. No concrete is needed for installation, and our WindMasts can be easily lowered and removed without a trace, leaving only footprints at the end of the project.
Down-to-earth
Our WindMast is assembled at ground level, so there’s no need for specialist equipment for working at heights. All the instruments you need can be fitted and tested prior to erecting the mast.
And it’s just as easy to install. Only a hand winch is required to tilt the WindMast skywards. The main mast is pulled upright using a ginpole, hinged at the baseplate by a heavily reinforced pivot.
It’s this ease of assembly allied with superior quality that’s made our WindMast class the preferred choice of many engineers around the world. To complete the picture, check out our full range of ancillary equipment available for the WindMast - from booms, sensors and loggers to lightning protection.

Further information
If you'd like a detailed quotation or have a question about our products, prices or service, we'll be happy to help. Call us now on:
Or email us at: info@nexgenwind.com